Waterloo & City Step Free Access

Description of Works

The overall scheme will provide “step free” access facilities to include, a new lift and circulation area from the Waterloo & City Line platforms into the main concourse and new ticket hall.

Phase 1 works of the project, the “Civils Works”, generally consists of the following:

  • Remove crash deck
  • Install pre-cast columns
  • Install pre-cast beams
  • Reinstall crash deck and fire stopping.
  • Install Omnia planks
  • Construct structural brickwork.
  • Construct service void concrete slab
  • Installation of new lift

Phase 2 works of the project, the “Premises Works”, generally consists of the following:

  • Construction of stainless steel curtain walling system
  • Wall and floor finishes including resin screeds, terrazzo floor tiles, sand and cement renders, and painted finishes
  • Supply and installation of the Cable Management System (CMS)
  • Supply and installation of the internal furniture, fixtures and fittings including guard rails and balustrades, lobby seating, and signage
  • Supply and installation of internal doors and PC roller shutter
Client Tube Lines South Quay Plaza Building 3 189 Marsh Wall London E14 9SH
Value £2m